High Risk Construction Work SWMS Bundle (2021 Compliant)

$550.00 incl. GST

CLICK HERE TO VIEW SAMPLE OF VERSION A 

CLICK HERE TO VIEW SAMPLE OF VERSION B

The High Risk Construction Work Safe Work Method Statement (SWMS) Bundle covers all high risk activities within the electrical and construction industry.

  • Instant Download in MS Word format
  • Fully Editable

Suitable for electrotechnology trades including:

Compliant in all Australian States and New Zealand

This product includes the following documents:

Style A HRCW SWMS – Blue Version 

  • PRIM-A-O-HR-100 Electrical SWMS
  • PRIM-A-O-HR-101 Working at Heights SWMS
  • PRIM-A-O-HR-102 Asbestos SWMS
  • PRIM-A-O-HR-103 Overhead Powerlines SWMS
  • PRIM-A-O-HR-104 Mobile Plant SWMS
  • PRIM-A-O-HR-105 Silica SWMS
  • PRIM-A-O-HR-106 Refrigerants SWMS
  • PRIM-A-O-HR-107 Confined Spaces SWMS
  • PRIM-A-O-HR-108 Excavation SWMS
  • PRIM-A-O-HR-109 Traffic SWMS
  • PRIM-A-O-HR-110 Extreme Temperature SWMS
  • PRIM-A-O-HR-111 Flammable Atmosphere SWMS
  • PRIM-A-O-HR-112 High Pressure Gas Lines SWMS
  • PRIM-A-O-HR-113 Water SWMS

Style B HRCW SWMS – Gold Version 

  • PRIM-B-O-HR-100 Electrical SWMS
  • PRIM-B-O-HR-101 Working at Heights SWMS
  • PRIM-B-O-HR-102 Asbestos SWMS
  • PRIM-B-O-HR-103 Overhead Powerlines
  • PRIM-B-O-HR-104 Mobile Plant SWMS
  • PRIM-B-O-HR-105 Silica SWMS
  • PRIM-B-O-HR-106 Refrigerants SWMS
  • PRIM-B-O-HR-107 Confined Spaces SWMS
  • PRIM-B-O-HR-108 Excavation SWMS
  • PRIM-B-O-HR-109 Traffic SWMS
  • PRIM-B-O-HR-110 Extreme Temperature SWMS
  • PRIM-B-O-HR-111 Flammable Atmosphere SWMS
  • PRIM-B-O-HR-112 High Pressure Gas Lines SWMS
  • PRIM-B-O-HR-113 Water SWMS

Additional Documents 

  • Job Safety Analysis / SWMS Cover Sheet
  • Safe Work Method Statement Letter

SWMS should be simple and easy to understand. At NECA we also understand the Subcontractors must prepare their SWMS to suit head contractors’ formats and wanted to make this easier for you guys, so our new SWMS format now comes in 2 styles:

Style A – Blue in colour, will be the simplest format that closely resembles the Safe Work Australia SWMS template. Everything not needed in a SWMS has been removed and stripped out. These are designed to be easier to read for your employees.

Style B – Gold in Colour, is a more complex format with addition information added to help members pass their principal contractors SWMS checklist

Both formats hold the same safety content, they It just provide you with a better starting point, closer to what your head contractors wants today. This saves you time and headaches.

The documents in this pack are not aimed to meet all of your legislative requirements but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.