Mobile Plant SWMS
$55.00 incl. GST
Work involving the use of mobile plant including awareness, trafficable areas, identifying safe areas of work, illumination, working near overhead equipment, lifting plant, unauthorised access, proper use of plant and controls, guarding, extreme temperatures, emergency stops, warning devices, maintenance and inspection and emergency planning.
- Instant Download in MS Word format
- Fully Editable
Suitable for electrotechnology trades including:
Compliant in all Australian States and New Zealand
This product includes the following documents:
- Mobile Plant SWMS
- Job Safety Analysis / SWMS Cover Sheet
- Safe Work Method Statement Letter
SWMS should be simple and easy to understand. At NECA we also understand the Subcontractors must prepare their SWMS to suit head contractors’ formats and wanted to make this easier for you guys, so our new SWMS format now comes in 2 styles:
Style A – Green in colour, will be the simplest format that closely resembles the Safe Work Australia SWMS template. Everything not needed in a SWMS has been removed and stripped out. These are designed to be easier to read for your employees.
Style B – Pink in Colour, is a more complex format with addition information added to help members pass their principal contractors SWMS checklist
Both formats hold the same safety content, they It just provide you with a better starting point, closer to what your head contractors wants today. This saves you time and headaches.
The documents in this pack are not aimed to meet all of your legislative requirements but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.