Switchboards and Motor Control ITP

$44.00 incl. GST

Electrical Switchboards, Motor Controls & Accessories

An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.

  • Instant Download in MS Word format
  • Fully Editable

Suitable for electrotechnology trades including:

Compliant in all Australian States and New Zealand

Activity –

  • Pre-Start Safety Documents and SWMS
  • Material Unloading, job site storage, and delivery to the installation area
  • Drawing and specification study
  • Layout, measuring and marking the installation location
  • Tool acquisition and return to storage
  • Unpacking of equipment. Inspection for any delivery damage
  • Installation of equipment to final location
  • Testing and commissioning of Switchgear and control gear
  • Clean up of waste and excess materials
Go to Top