An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.

  • Instant Download in MS Word format
  • Fully Editable

Suitable for electrotechnology trades including:

Compliant in all Australian States and New Zealand

Activity –

  • Pre-Start Safety Documents and SWMS
  • Material Unloading, job site storage, and delivery to the installation area.
  • Drawing and specification study.
  • Layout, measuring and marking the installation location.
  • Tool acquisition and return to storage.
  • Unpacking and assembly of luminaires, Inspection for any delivery damage
  • Installation of luminaires complete with lamps, tubes, covers and lenses. Termination of subcircuit cabling to luminaires.
  • Clean up of waste and excess materials