Verification Testing SWMS
$55.00 incl. GST
Electrical testing processes including preparing for electrical work, site set up, and using tools and equipment, asbestos awareness, risk assessment, securing area, planning and ensuring coordination of activities, identifying all energy sources and confirming isolation, undertaking visual inspection to confirm installation work is complete to client’s specification, completing installation connections to switchboard, removing bonding leads, checking device/equipment for integrity and good working order, testing new installation prior to energising, replacing removable switches and rack in, energise and test wiring and check equipment and apparatus as operational before return to service, tidy up, remove equipment from site, remove signage and barriers, and handover.
- Instant Download in MS Word format
- Fully Editable
Suitable for electrotechnology trades including:
Compliant in all Australian States and New Zealand
This product includes the following documents:
- Verification Testing SWMS
- Job Safety Analysis / SWMS Cover Sheet
- Safe Work Method Statement Letter
SWMS should be simple and easy to understand. At NECA we also understand the Subcontractors must prepare their SWMS to suit head contractors’ formats and wanted to make this easier for you guys, so our new SWMS format now comes in 2 styles:
Style A – Green in colour, will be the simplest format that closely resembles the Safe Work Australia SWMS template. Everything not needed in a SWMS has been removed and stripped out. These are designed to be easier to read for your employees.
Style B – Pink in Colour, is a more complex format with addition information added to help members pass their principal contractors SWMS checklist.
Both formats hold the same safety content, they It just provide you with a better starting point, closer to what your head contractors wants today. This saves you time and headaches.
The documents in this pack are not aimed to meet all your legislative requirements but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.
Attention NECA Members!
This product is free along with hundreds of other safety documents with your membership.
Login to NECA’s Technical Knowledge Base to access this product free of charge