• NECA Hazard/Risk Register

    $275.00 incl. GST
    • Instant Download in MS Excel, PDF & Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes the following documents:
    • Hazard Management Procedure
    • Hazard/Risk Register in Excel, PDF & Word

    Overview

    A hazard register is a high level listing of activities at a workplace, site or company, an assessment of the risk and a summary of the means by which they will be controlled. Developing a Hazard Register is the first step in the hazard management process for a business or project. It should also be reviewed before a large project commences and reviewed regularly to ensure it reflects the current scope of activities and latest standards/controls. It is used to determining which hazards will require a SWMS to be developed. To ensure the Hazard Register is being kept up to date, you must report any new hazard so that it is entered and analysed. A hazard Register shall:
    • Identify all activities undertaken on the project or in the business
    • Identify all hazards associated with each activity inclusive of plant, chemicals & manual handling
    • Assess the risk level associated with each hazard
    • Nominate the requirements to consider i.e.  documents, client documents & legislation/standards
    The Hazard Register is used to define which elements of the workforce require knowledge of specific procedures and work instructions to ensure the critical elements of the systems and required work practices are communicated to the people that matter. The system also forms a closed loop through defined revision practices such as workplace inspection, system auditing and incident investigation that feed back into the Hazard Register to ensure continuous improvement of the process. Types of fields usually found in a register include:
    • Activity – the tasks that is to be performed on the project/contract
    • Hazard – Lists all the potential hazards associated with the activity
    • Mechanism/Pathway of Harm – Identifies how can the hazard cause harm
    • Impact – What is the potential harm/consequences caused by the hazard
    • Control measures in place – What things are already in place to prevent the hazard from causing harm
    • Risk Rating
    • Likelihood (L): using the risk level matrix rate the likelihood of the harm occurring (rate from 1-5)
    • Consequence (C): using the same matrix rate the potential consequence that could occur (rate from 1-5)
    • Risk Level (R): using the same matrix plot the likelihood versus the consequence to obtain a risk level
    • Frequency of Task - This is expressed as High, Medium or Low.  Where a task is relatively routine (medium to high) there may be less need for a written Pre-Start HRA.  Start Right is always required.  SWMSs are required by law for all high risk activities.
    • Documentation
      • Start Right is the practice to be followed by all workers or pausing and considering possible hazards before undertaking any activity.
      • Pre-Start HRA is a document that sets out site-specific hazards created by a work group before undertaking a medium or high risk activity.
      • Safe Work Method Statement is required for all high risk construction work, which includes electrical work.  It may be generic.
    Add to cart Details
  • SAFETY MANAGEMENT SYSTEM

    $3,850.00 incl. GST
    Safety Management System
    • Instant Download in MS Word format
    • Fully Editable
    • Includes
    • 42 SWMS (Style A and Style B)
    • 3o SWP's
    • 34 Policies
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand

    Safety Management System – Complete Compliance Package for Electrotechnology Trades

    Take the hassle out of compliance with our professionally developed Safety Management System Package — designed specifically for the electrotechnology industry across Australia and New Zealand.

    Whether you are an electrical contractor, communications technician, solar installer, data cabler, or construction business, this package provides the essential documentation needed to support safe systems of work and workplace compliance.

    What’s Included

    Instant Download
    Fully Editable MS Word Documents
    ✔ Ready to customise with your company branding and project requirements

    Complete Package Includes

    • 42 Safe Work Method Statements (SWMS)
      • Includes both Style A and Style B formats
    • 30 Safe Work Procedures (SWP’s)
    • 34 Workplace Policies

    Suitable For

    Designed for electrotechnology trades including:

    • Electrical Contractors
    • Commercial Electricians
    • Industrial Electricians
    • Data & Communications Technicians
    • Solar Installers
    • Security Installers
    • Automation & Control Technicians
    • Construction Electrical Workers

    Compliance Coverage

    Developed to align with requirements applicable across:

    • Australia (All States & Territories)
    • New Zealand

    Documentation Categories Included

    Construction SWMS

    Comprehensive SWMS covering common construction and site-based activities.

    Electrical SWMS

    Industry-specific electrical safety documentation for high-risk and routine electrical work.

    Communication SWMS

    Safe work documentation tailored for communications and data installation activities.

    Safe Work Procedures

    Clear procedural guidance for everyday operational tasks.

    Policies

    A broad suite of workplace health and safety policies to support your business management systems.


    Why Choose This Package?

    • Save countless hours developing documents from scratch
    • Professional, practical and easy-to-use templates
    • Fully editable to suit your business operations
    • Suitable for businesses of all sizes
    • Ideal for contractors, subcontractors and growing teams

    Get your compliance systems organised quickly and professionally with a complete safety documentation solution built for the electrotechnology industry.

     
    Add to cart Details
  • CLICK HERE TO VIEW SAMPLE Basics of Safety
    • 100 Toolbox Talks PDF Files
    • Instant download

    Toolbox talks are designed to assist supervisors and managers at all levels to distribute safety related information and guidance to work team members in an informal but practical forum.

    With the topics already created, this saves you a lot of work.

    This product is Free for NECA Members just click on links below for your access or Join NECA Now

    Attention NECA Members!

    This product is free along with hundreds of other safety documents with your membership. Login to NECA’s Technical Knowledge Base to access this product free of charge    
    Add to cart Details
  • Suitable Duties Manual

    $38.50 incl. GST
    Suitable Duties Manual (Electrical and communications industry)
    • Instant download
    This manual provides a range of suitable duties that exist in the electrical and communications industry. Suitable duties are short-term activities taking into account any limitations the injured worker may have while recovering from the injury. The identification of suitable duties is an important step in the injury management process ensuring the prompt, safe and durable return-to-work of an injured worker. These duties assist with the injured worker’s rehabilitation and expedite the recovery process, as the worker maintains a link to the workplace.
    Add to cart Details
  • AMP - Asbestos Management Plan
    Add to cart Details
  • EMP - Site Specific Environmental Management Plan
    Add to cart Details
  • Whats the difference between an “electrician” and a “Quality electrician”? Planning, execution and evidence. Although electrical contractors are only required to issue customers with a certificate of test, documented inspection and test procedures, and inspection and test records provide evidence of the actual test results which support the certificate. They also provide workers with a visual reminder of the step by step testing process. Workers can easily review the completed test record and identify if any steps have been missed. This Quality Management Plan procedure comes with:
    • Electrical Installation Testing Record Sheet
    • Electrical Inspection and Test Plan
    • Electrical Inspection and Test Plan Checklist
    • Residual Current Device (RCD) Test Record
    This procedure will provide a framework for effect quality management. Ideal for tenders and business improvement. (MS Word)   Want a printed folder? Our folder creator tool will allow you to select what documents you want from the NECASafe library, attach your logo and a few other details. We will then quote, print and deliver the folders. These safety folders can be used for employees, vehicles or site safety folders. You can even attach your own documentation to be included in the folder. Go to NECA Safety Folder Creator Tool for a free quote or call us.  
    Add to cart Details
  • SMP - Site Specific Safety Management Plan
    Add to cart Details
  • By ordering this product the NECA WHS team will arrange for a free consultation to demonstrate this product.
    • Customize WHS documents to each site
    • Add company name, site details and logos to multiple documents in minutes  
    • Pass CM3, Pegasus and Browz audits
    SAFETY GEN will pull up-to-date safety templates from the cloud, the user than defines the content variables. It then quickly generates accurate, compliant documents. Suitable for multiple trades including: Compliant in all Australian States and New Zealand Safety Gen is an affordable safety management system document pack that creates site specific forms and SWMS in minutes. Anything from full safety management plans with all the forms tailored to a client or a SWMS pack with site address, company logo, principle contractor details. Safety GEN will pull up-to-date safety templates from the cloud, the user than defines the content variables. It then quickly generates accurate, compliant documents. Safety GEN  is a tool for search and replace operations over multiple files. You can apply ordinary "word by word" replacement, fully featured regular expressions or choose to change pictures /logos. Safety GEN was created out of the need to change the layout safety manuals to meet site specific or auditing needs. Builders will often ask electricians to provide safety documentation. They will either ask for just SWMS or they might ask for a safety management plan. These documents need to be site specific and normally contain multiple documents. If the electrician needs to submit 20 documents to the builder, normally the electrician would open the document, search and replace the variables in that document, save the document to a new folder, repeat 19 more times, compress the files and then send to the builder. This can take up to 2 hours depending on how quick you are with a computer. With Safety GEN you input the variables, drag and drop a logo, generate and share. This completes the same task in about 2 mins. Different document packages or the safety manual arrange in different ways allows the electrician  generate a set of documents depending on the challenges they face that day. It may be a CM3 audit, an internal Induction, SWMS for builders, HR or legal documents or a site specific safety management plan. 2mins and its done.
    Add to cart Details
  • Sale!

    DISCONNECTION OF UNDERGROUND SERVICE MAINS Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A109 DISCONNECTION OF UNDERGROUND SERVICE MAINS
    Add to cart Details
  • Sale!

    INSTALLATION OF METERING EQUIPMENT Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A113 INSTALLATION OF METERING EQUIPMENT ON AS
    Add to cart Details
  • Sale!

    REMOVAL OF METERING EQUIPMENT Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A112 REMOVAL OF METERING EQUIPMENT
    Add to cart Details
  • Sale!

    INSTALLATION OF METERING EQUIPMENT Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A111 INSTALLATION OF METERING EQUIPMENT
    Add to cart Details
  • Sale!

    INSTALLATION OF OVERHEAD SERVICE MAINS Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A110 INSTALLATION OF OVERHEAD SERVICE MAINS
    Add to cart Details
  • Sale!

    RECONNECTION OF CONSUMER MAINS AT POA Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A106 RECONNECTION OF CONSUMER MAINS AT POA
    Add to cart Details
  • Sale!

    DISCONNECTION OF CONSUMER MAINS AT POA Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A105 DISCONNECTION OF CONSUMER MAINS AT POA
    Add to cart Details
  • Sale!

    REPLACEMENT OF SERVICE FUSE BASE Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A104 REPLACEMENT OF SERVICE FUSE BASE
    Add to cart Details
  • Sale!

    REINSTATE SERVICE AND ENERGISE INSTALLATION Safe Work Method Statement (SWMS)

    Original price was: $55.00.Current price is: $38.50. incl. GST
    Safe Work Method Statement (SWMS) A103 REINSTATE SERVICE AND ENERGISE INSTALLAT
    Add to cart Details
Go to Top