An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
  • Instant Download in MS Word format
  • Fully Editable
Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes:
  • Quality Management Plan
  • Conduit ITP
  • Ladder Tray and Ducts ITP
  • Cables and Accessories ITP
  • Switchboards and Motor Control ITP
  • Light Fittings ITP
  • Earthing Systems ITP
  • Communications ITP
  • Electrical Equipment Register
  • Electrical Installation Testing Record Sheet
  • Residual Current Device (RCD) Test Record