• An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes:
    • Quality Management Plan
    • Conduit ITP
    • Ladder Tray and Ducts ITP
    • Cables and Accessories ITP
    • Switchboards and Motor Control ITP
    • Light Fittings ITP
    • Earthing Systems ITP
    • Communications ITP
    • Electrical Equipment Register
    • Electrical Installation Testing Record Sheet
    • Residual Current Device (RCD) Test Record
    Add to cart Details
  • Earthing Systems ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Installation of earthing system equipment
    • Earthing system clamps and terminations
    • Clean up of waste and excess materials