• Decommissioning ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Setup and removal of jacks, winches and cable pullers
    • Installation and dressing of cables
    • Testing and commissioning of cables for continuity
    • Clean up of waste and excess materials
    Add to cart Details
  • An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Setup and removal of jacks, winches and cable pullers
    • Installation and dressing of cables
    • Testing and commissioning of cables for continuity
    • Clean up of waste and excess materials
    Add to cart Details
  • Ladders, Ladder Trays, Trays, Ducts, Strut, Brackets and Associated Fittings An "Inspection and Test Plan" (ITP) might also be called a "Quality Inspection Plan". Inspection and Test Plans set out critical control points or 'hold points' at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity -
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Measuring, cutting and handling of materials.
    • Installation of cable support systems, including strut brackets
    • Clean up of waste and excess materials.
    Add to cart Details
  • Conduit ITP

    $44.00 incl. GST
    Conduits, Conduit Fittings, Civil and Underground Items An "Inspection and Test Plan" (ITP) might also be called a "Quality Inspection Plan". Inspection and Test Plans set out critical control points or 'hold points' at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity -
    • Pre-Start Safety Documents and SWMS.
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Measuring, cutting, threading (where required) and handling of conduit.
    • Installation of conduits and associated saddles (complete with fixings).
    • Clean up of waste and excess materials.
    Add to cart Details