This SWMS outlines the safe procedure for the removal of service fuse carriers in low-voltage electrical installations. Key hazards include electric shock, arc flash, and burns from live parts. Controls include electrical isolation, testing for de-energisation, use of insulated tools and arc-rated PPE, and ensuring a trained standby person is present.
The task must only be carried out by qualified personnel who have current training in Low Voltage Rescue and CPR. Work should follow a formal pre-start risk assessment, include appropriate signage and barriers, and comply with relevant electrical safety regulations and Australian Standards (e.g., AS/NZS 4836).
Suitable for electrotechnology trades including:
Compliant in all Australian States and New Zealand

- Understanding NECA SWMS
- JSA SWMS Cover Sheet
- Remove Service Fuse Carriers SWMS – Style A
- Remove Service Fuse Carriers SWMS – Style B
- SWMS Sign off Sheet
- Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents.
- Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation.
- Simplify compliance with principal contractor requirements.
- Save admin time with editable MS Word templates ready for instant download.
- Provide clear, user-friendly documents to reduce frustration in the workplace.