The Safe Work Method Statement (SWMS) for Site Safety Assessment and Setup for ASP Level 1 and Level 2 works outlines the procedures and risk controls required to establish a safe working environment when constructing, upgrading, or connecting electrical infrastructure within the distribution network. This includes overhead and underground works, service connections, metering installations, and associated civil activities. It ensures compliance with Australian Work Health and Safety (WHS) legislation, the Electricity Supply (Safety and Network Management) Regulation, network operator requirements, and relevant Australian Standards (e.g. AS/NZS 3000).
Key focus areas include conducting a comprehensive site risk assessment prior to work commencement, identifying underground and overhead electrical assets, confirming network isolation requirements, and establishing appropriate exclusion and no-go zones. It highlights the setup of site-specific traffic and pedestrian management plans, placement of warning signage and physical barriers, and ensuring the stability of the work area (including excavations, ground conditions, and access points).
This SWMS also addresses ensuring all workers have completed ASP site inductions, verifying authorisations for live work (if applicable), and coordinating with the network operator’s representative before energisation or de-energisation. Emergency preparedness is included, such as confirming the location of first aid kits, fire extinguishers, spill kits, and emergency assembly points.
By following this SWMS, ASP crews can minimise risks associated with electrical hazards, plant and vehicle movements, excavation collapse, and unauthorised public access, ensuring the worksite is established safely, efficiently, and in compliance with WHS and network operator requirements before construction or connection works commence.
Suitable for electrotechnology trades including:
Compliant in all Australian States and New Zealand

- Understanding NECA SWMSÂ
- JSA SWMS Cover SheetÂ
- Site Safety Assessment and Setup SWMS – Style A
- Site Safety Assessment and Setup SWMS – Style BÂ
- SWMS Sign off SheetÂ
- Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents.Â
- Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation.Â
- Simplify compliance with principal contractor requirements. Â
- Save admin time with editable MS Word templates ready for instant download. Â
- Provide clear, user-friendly documents to reduce frustration in the workplace. Â