• Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes the following documents:  
    • Safe Work in the Rail Corridor SWMS
    • Job Safety Analysis / SWMS Cover Sheet
    • Safe Work Method Statement Letter
        SWMS should be simple and easy to understand. At NECA we also understand the Subcontractors must prepare their SWMS to suit head contractors’ formats and wanted to make this easier for you guys, so our new SWMS format now comes in 2 styles: Style A – Green in colour, will be the simplest format that closely resembles the Safe Work Australia SWMS template. Everything not needed in a SWMS has been removed and stripped out. These are designed to be easier to read for your employees. Style B – Pink in Colour, is a more complex format with addition information added to help members pass their principal contractors SWMS checklist. Both formats hold the same safety content, they It just provide you with a better starting point, closer to what your head contractors wants today. This saves you time and headaches.   The documents in this pack are not aimed to meet all your legislative requirements but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.
    Add to cart Details
  • Key Features:

    • Job Safety Analysis / SWMS Cover Sheet:
      • Comprehensive cover for all your SWMS documents.
    • Safe Work Method Statement Instructions:
      • Clear guidance to help you create compliant SWMS.

    Benefits:

    • Instant Download:
      • Available in MS Word format for quick and easy access.
    • Fully Editable:
      • Customise documents to fit your specific business needs.
    • Legislative Compliance:
      • Meets new requirements effective 1st September 2024, ensuring you stay up-to-date with industry standards.
    • Wide Coverage:
      • Compliant across all Australian states and New Zealand (except Victoria).

    Why Choose NECA’s SWMS?

    • Save Time and Effort: Our document pack simplifies the creation of SWMS, helping you avoid the hassle of starting from scratch.
    • Flexibility and Adaptability: Two format styles cater to different contractor requirements, streamlining your compliance process.

    Take Action Now

    Protect your business and employees by staying compliant with the latest safety requirements. Download NECA’s Safe Work Method Statement.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand
    Add to cart Details
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes the following documents:  
    • Safe Work in the Rail Corridor SWMS
    • Job Safety Analysis / SWMS Cover Sheet
    • Safe Work Method Statement Letter
        SWMS should be simple and easy to understand. At NECA we also understand the Subcontractors must prepare their SWMS to suit head contractors’ formats and wanted to make this easier for you guys, so our new SWMS format now comes in 2 styles: Style A – Green in colour, will be the simplest format that closely resembles the Safe Work Australia SWMS template. Everything not needed in a SWMS has been removed and stripped out. These are designed to be easier to read for your employees. Style B – Pink in Colour, is a more complex format with addition information added to help members pass their principal contractors SWMS checklist. Both formats hold the same safety content, they It just provide you with a better starting point, closer to what your head contractors wants today. This saves you time and headaches.   The documents in this pack are not aimed to meet all your legislative requirements but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.
    Add to cart Details
  • Note: This offer is exclusively for IEC Solutions Pty Ltd and applies only to the HSEQ System Download.
    Add to cart Details
  • Silica SWMS

    $75.00 incl. GST
    Silica Safe Work Method Statement (SWMS) SWMS Overview

    The Silica Safe Work Method Statement (SWMS) is an essential resource for businesses in the electrotechnology industry, providing clear and actionable guidelines for managing tasks involving Respirable Crystalline Silica (RCS). Whether it’s drilling, cutting, chipping, or chasing materials containing silica, this document ensures workplace safety and compliance. Designed to help manage silica dust exposure and meet occupational health and safety regulations, the Silica SWMS outlines critical safety measures for both low and high-risk tasks.

    Built on industry best practices, the Silica SWMS includes procedures for effective dust control, risk assessments, and safe work methods, equipping businesses with tools to confidently address silica hazards. It supports organisations in adhering to regulatory requirements, such as those outlined by Safe Work Australia, while promoting efficiency and safety on-site.

    For businesses in Australia (besides Victoria and ACT), it is recommended you purchase the Silica Compliance Document Pack & SWMS. This product provides access to the Silica SWMS, Silica Risk Assessment (to determine if the processing of a CSS is high risk), and the Silicosis Health Monitoring Assessment Form—ensuring you have the complete tools for maintaining compliance and safety.

    Adopting the Silica SWMS helps businesses protect workers from silica-related illnesses, maintain compliance with workplace health and safety laws, and foster a proactive safety culture. This comprehensive silica dust management resource demonstrates your commitment to employee safety, risk mitigation, and maintaining a legally compliant and safe work environment.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included This ready-to-use SWMS package features:
    • Understanding NECA SWMS
    • JSA SWMS Cover Sheet
    • Silica SWMS – Style A
    • Silica SWMS – Style B
    • SWMS Sign Off Sheet
    Flexible SWMS Styles To meet unique project and contractor needs, we’ve developed two consistent SWMS styles:
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents.
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation.
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process. Why Choose NECA SWMS? NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:
    • Simplify compliance with principal contractor requirements.
    • Save admin time with editable MS Word templates ready for instant download.
    • Provide clear, user-friendly documents to reduce frustration in the workplace.
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance. With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.  
    Add to cart Details
  • Add to cart Details
  • ASP Level 1 SWMS Bundle

    $770.00 incl. GST
    Add to cart Details
  • Rescue Plan Template

    $5.50 incl. GST
    Add to cart Details
  • Sale!

    Flood Disaster Recovery Electrical Testing Clearance documents

    Original price was: $11.00.Current price is: $0.00. incl. GST
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes the following documents:
    • Certificate of Periodic Verification (based on AS/NZS 3019:2007 Electrical installations - parodic verification)
    • Electrical Installation Testing Record Sheet
    Attention NECA Members! This product is free along with hundreds of other safety documents with your membership. Login to NECA’s Technical Knowledge Base to access this product free of charge
    Add to cart Details
  • Decommissioning ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Setup and removal of jacks, winches and cable pullers
    • Installation and dressing of cables
    • Testing and commissioning of cables for continuity
    • Clean up of waste and excess materials
    Add to cart Details
  • An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand This product includes:
    • Quality Management Plan
    • Conduit ITP
    • Ladder Tray and Ducts ITP
    • Cables and Accessories ITP
    • Switchboards and Motor Control ITP
    • Light Fittings ITP
    • Earthing Systems ITP
    • Communications ITP
    • Electrical Equipment Register
    • Electrical Installation Testing Record Sheet
    • Residual Current Device (RCD) Test Record
    Add to cart Details
  • Communications ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Setup and removal of jacks, winches and cable pullers
    • Installation and dressing of cables
    • Testing and commissioning of cables for continuity
    • Clean up of waste and excess materials
    Add to cart Details
  • Earthing Systems ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Installation of earthing system equipment
    • Earthing system clamps and terminations
    • Clean up of waste and excess materials
    Add to cart Details
  • Light Fittings ITP

    $44.00 incl. GST
    An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Unpacking and assembly of luminaires, Inspection for any delivery damage
    • Installation of luminaires complete with lamps, tubes, covers and lenses. Termination of subcircuit cabling to luminaires.
    • Clean up of waste and excess materials
    Add to cart Details
  • Electrical Switchboards, Motor Controls & Accessories An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area
    • Drawing and specification study
    • Layout, measuring and marking the installation location
    • Tool acquisition and return to storage
    • Unpacking of equipment. Inspection for any delivery damage
    • Installation of equipment to final location
    • Testing and commissioning of Switchgear and control gear
    • Clean up of waste and excess materials
    Add to cart Details
  • An “Inspection and Test Plan” (ITP) might also be called a “Quality Inspection Plan”. Inspection and Test Plans set out critical control points or ‘hold points’ at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity –
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Setup and removal of jacks, winches and cable pullers
    • Installation and dressing of cables
    • Testing and commissioning of cables for continuity
    • Clean up of waste and excess materials
    Add to cart Details
  • Ladders, Ladder Trays, Trays, Ducts, Strut, Brackets and Associated Fittings An "Inspection and Test Plan" (ITP) might also be called a "Quality Inspection Plan". Inspection and Test Plans set out critical control points or 'hold points' at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity -
    • Pre-Start Safety Documents and SWMS
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Measuring, cutting and handling of materials.
    • Installation of cable support systems, including strut brackets
    • Clean up of waste and excess materials.
    Add to cart Details
  • Conduit ITP

    $44.00 incl. GST
    Conduits, Conduit Fittings, Civil and Underground Items An "Inspection and Test Plan" (ITP) might also be called a "Quality Inspection Plan". Inspection and Test Plans set out critical control points or 'hold points' at various stages within a process. Each control point is a scheduled inspection or verification activity where you will make sure that things are progressing as they should be. Inspection and Test Plans are often used as a way to satisfy the requirements of the ISO 9001 standard related to control of production and service provision.
    • Instant Download in MS Word format
    • Fully Editable
    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand Activity -
    • Pre-Start Safety Documents and SWMS.
    • Material Unloading, job site storage, and delivery to the installation area.
    • Drawing and specification study.
    • Layout, measuring and marking the installation location.
    • Tool acquisition and return to storage.
    • Measuring, cutting, threading (where required) and handling of conduit.
    • Installation of conduits and associated saddles (complete with fixings).
    • Clean up of waste and excess materials.
    Add to cart Details
Go to Top