This task involves installing metering equipment on meter panels that contain or may contain asbestos. Hazards include asbestos exposure, electric shock, and arc flash. Control measures include assuming panels contain asbestos unless tested, avoiding drilling or disturbing the panel, wearing appropriate PPE (P2 mask, disposable coveralls, gloves), isolating and testing circuits, and using wet methods or HEPA vacuums to control dust. Only trained and licensed personnel are to perform the work. All asbestos waste must be correctly bagged and disposed of. Emergency procedures and inductions are required.
Suitable for electrotechnology trades including:
Compliant in all Australian States and New Zealand

- Understanding NECA SWMSÂ
- JSA SWMS Cover SheetÂ
- Installation of Metering Equipment on ACM (Asbestos-Containing Material) Meter Panels SWMS – Style A
- Installation of Metering Equipment on ACM (Asbestos-Containing Material) Meter Panels SWMS – Style BÂ
- SWMS Sign off SheetÂ
- Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents.Â
- Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation.Â
- Simplify compliance with principal contractor requirements. Â
- Save admin time with editable MS Word templates ready for instant download. Â
- Provide clear, user-friendly documents to reduce frustration in the workplace. Â