• Temporary Generator Installation Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves the installation of a temporary generator to supply power during outages or planned works. Key hazards include electric shock, backfeeding into the network, fuel handling risks, fire, manual handling injuries, and noise exposure. Control measures include isolating and locking out the normal supply, using appropriate changeover switches, earthing the generator correctly, and ensuring proper ventilation. Fuel must be stored and handled safely, with spill kits on hand. PPE includes hearing protection, gloves, and arc-rated clothing. Only qualified electricians are to perform electrical connections. All workers must be trained, inducted, and emergency procedures must be established.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Temporary Generator Installation SWMS – Style A
    • Temporary Generator Installation SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Sale!

    Cable Jointing, Terminations and Installation of Switchgear SWMS

    Original price was: $75.00.Current price is: $55.00. incl. GST
    Cable Jointing, Terminations and Installation of Switchgear Safe Work Method Statement (SWMS)  SWMS Overview 

    The Safe Work Method Statement (SWMS) for Cable Jointing, Terminations and Installation of Switchgear outlines the safe work practices required for the preparation, jointing, terminating, and testing of low-voltage (LV) and high-voltage (HV) cables, as well as the installation and commissioning of electrical switchgear. It ensures compliance with Australian Work Health and Safety (WHS) legislation, the Electricity Supply (Safety and Network Management) Regulation, and relevant standards including AS/NZS 3000 Wiring Rules, AS/NZS 1429 for cables, and AS 62271 for HV switchgear.

    Key focus areas include conducting site-specific risk assessments, verifying network isolation and access permits, and ensuring exclusion zones are established around HV work areas. It details the correct handling and preparation of cables, use of insulated and calibrated tools, and adherence to manufacturer specifications for jointing kits and termination systems.

    The SWMS addresses switchgear installation requirements, including correct mechanical anchoring, ensuring proper clearance and ventilation, verifying earthing and bonding arrangements, and performing dielectric and continuity testing before energisation. It also includes safe manual handling of heavy components, use of lifting aids for switchgear and cable drums, and confined/restricted space procedures when working within pits or enclosures.

    Electrical safety protocols cover the use of arc-rated PPE, insulated gloves, voltage detectors, and lockout/tagout procedures, as well as maintaining correct sequencing for HV terminations to prevent induced voltages or backfeed. Emergency response plans include arc flash incidents, electric shock, confined space rescue, and first aid requirements.

    By following this SWMS, workers can minimise risks such as electric shock, arc flash, tool-related injuries, manual handling strain, confined space hazards, and environmental contamination, ensuring cable jointing, terminations, and switchgear installations are completed safely and to network operator and regulatory standards.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Cable Jointing, Terminations and Installation of Switchgear SWMS – Style A
    • Cable Jointing, Terminations and Installation of Switchgear SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Sale!

    Land Kiosk Substation SWMS

    Original price was: $75.00.Current price is: $55.00. incl. GST
    Land Kiosk Substation Safe Work Method Statement (SWMS)  SWMS Overview 

    The Safe Work Method Statement (SWMS) for Land Kiosk Substation Construction, Installation and Commissioning provides a structured approach to managing the risks associated with handling, installing, and energising kiosk substations within the electrical distribution network. This includes transport, cranage, positioning, cable terminations, earthing, testing, and commissioning in accordance with Australian Work Health and Safety (WHS) legislation, the Electricity Supply (Safety and Network Management) Regulation, and relevant standards such as AS 2067 (Substations and High Voltage Installations) and AS/NZS 3000 (Wiring Rules).

    Key focus areas include conducting site-specific risk assessments, confirming network isolation or access permits, and verifying underground services before excavation or positioning. It details safe use of cranes, lifting beams, and spreader bars to move and install heavy kiosk units, with clear communication protocols between the lifting team and spotters.

    The SWMS covers HV and LV electrical safety requirements, including the use of insulated tools, correct termination techniques, earthing and bonding of the kiosk prior to connection, and safe sequencing of works to eliminate step and touch potential. It also addresses confined/restricted space entry procedures where required for underground cable access, as well as traffic and pedestrian management around the site.

    Environmental considerations include soil and spill control, safe handling of transformer oil (if applicable), ensuring the plinth is level and structurally compliant, and avoiding damage to adjacent services or vegetation. Emergency response procedures are included for electrical contact incidents, crane/lifting failures, fire, and spill containment.

    By implementing this SWMS, workers can minimise risks such as electric shock, arc flash, lifting injuries, plant collisions, manual handling strain, and environmental contamination, ensuring kiosk substations are installed safely, efficiently, and in full compliance with network operator and regulatory requirements.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Land Kiosk Substation SWMS – Style A
    • Land Kiosk Substation SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • ASP Level 1 SWMS Bundle

    $750.00 incl. GST
    ASP Level 1  Safe Work Method Statement (SWMS)  SWMS Overview 

    The ASP Level 1 Safe Work Method Statement (SWMS) Bundle provides a comprehensive set of documents outlining the safe systems of work for Accredited Service Providers undertaking Level 1 electrical construction tasks. These tasks primarily relate to the construction and installation of network infrastructure before it is energised, including high-risk construction activities.

      Suitable for electrotechnology trades  Compliant in all Australian States and New Zealand What’s Included This ready-to-use SWMS package features:
    • Site Assessment and Set Up for ASP
    • Underground Powerline Construction
    • Overhead Powerline Construction
    • Street Light Installation
    • Earth Grid Construction and Earthing
    • Land Kiosk Substation
    • Cable Jointing and Installation of Switchgear
    • High Voltage Testing
    • Crane Borer Operations
    Each document is packed with industry-specific best practices, proactive hazard controls, and clear regulatory guidelines to empower your team to safely manage high-risk activities with confidence. Investing in the HRCW SWMS Bundle not only enhances workplace safety but also ensures your business remains compliant with strict safety laws in Australia and New Zealand. By adopting this essential resource, you demonstrate a firm commitment to risk management, worker protection, and operational excellence. Don’t risk non-compliance or workplace injuries—equip your team with the HRCW SWMS Bundle today and take the first step towards a safer, more efficient, and legally compliant work environment. Flexible SWMS Styles To meet unique project and contractor needs, we’ve developed two consistent SWMS styles:
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents.
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation.
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process. Why Choose NECA SWMS? NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:
    • Simplify compliance with principal contractor requirements.
    • Save admin time with editable MS Word templates ready for instant download.
    • Provide clear, user-friendly documents to reduce frustration in the workplace.
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance. With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process. Have you considered a NECASafe Generator system instead?
    • Access NECASafe’s comprehensive library of safety documents
    • Stay compliant with automatic updates tailored to industry standards
    • Create site-specific documents in minutes—no more tedious Cut, Copy, and Paste
    The NECASafe Generator is the ultimate tool for contractors looking to streamline safety compliance. This powerful platform allows you to effortlessly create, manage, and store all your safety documentation in one secure location. From SWMS to detailed safety plans, NECASafe simplifies the entire compliance process. Save time, cut down on administrative tasks, and maintain compliance with expertly designed templates and intuitive tools. Focus on growing your business while NECASafe takes care of your safety management needs. Start today and eliminate the stress of compliance for good!!
    Add to cart Details
  •   Installation of Metering Equipment on ACM (Asbestos-Containing Material) Meter Panels Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves installing metering equipment on meter panels that contain or may contain asbestos. Hazards include asbestos exposure, electric shock, and arc flash. Control measures include assuming panels contain asbestos unless tested, avoiding drilling or disturbing the panel, wearing appropriate PPE (P2 mask, disposable coveralls, gloves), isolating and testing circuits, and using wet methods or HEPA vacuums to control dust. Only trained and licensed personnel are to perform the work. All asbestos waste must be correctly bagged and disposed of. Emergency procedures and inductions are required.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Installation of Metering Equipment on ACM (Asbestos-Containing Material) Meter Panels SWMS – Style A
    • Installation of Metering Equipment on ACM (Asbestos-Containing Material) Meter Panels SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.           
    Add to cart Details
  • Removal of Metering Equipment Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves the safe removal of electrical metering equipment from the point of supply. Key hazards include electric shock, arc flash, incorrect isolation, and exposure to asbestos-containing meter panels. Control measures include isolating and testing for dead, applying lockout/tagout procedures, using insulated tools and arc-rated PPE, and following network provider disconnection protocols. If asbestos is suspected, appropriate precautions must be taken, including use of P2 masks and avoiding disturbance. Only licensed electricians may carry out the work. All personnel must be trained, inducted, and emergency procedures must be in place.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Removal of Metering Equipment SWMS – Style A
    • Removal of Metering Equipment SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.             
    Add to cart Details
  • Installation of Metering Equipment Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves the installation of metering equipment for electrical supply, including mounting, wiring, and commissioning at the point of supply. Key hazards include electric shock, arc flash, incorrect wiring, confined workspace, and manual handling injuries. Control measures include isolating and proving de-energisation, lockout/tagout procedures, use of insulated tools and arc-rated PPE, ensuring correct wiring and polarity, and following distribution network provider requirements. Only licensed electricians are to perform this work. All personnel must be inducted, and emergency response procedures must be in place and understood.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Installation of Metering Equipment SWMS – Style A
    • Installation of Metering Equipment SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
     
    Add to cart Details
  • Installation of Overhead Service Mains Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves the installation of overhead service mains from the point of supply to the customer’s point of attachment. Hazards include working at heights, electric shock, falls, dropped objects, and contact with live or nearby services. Control measures include isolating supply where possible, use of elevated work platforms (EWP) or ladders with fall protection, appropriate PPE (including insulated gloves and arc-rated clothing), maintaining exclusion zones, and using certified lifting and rigging equipment. Only qualified personnel are to carry out the work. All workers must be trained, inducted, and emergency procedures must be in place.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Installation of Overhead Service Mains SWMS – Style A
    • Installation of Overhead Service Mains SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  •   Disconnection of Service Mains Safe Work Method Statement (SWMS)  SWMS Overview 

    This activity involves the safe disconnection of service mains from the point of supply to the installation. Key hazards include electric shock, arc flash, exposure to live conductors, and inadvertent energisation. Control measures include full isolation and testing to confirm de-energisation, application of lockout/tagout devices, use of insulated tools and arc-rated PPE, and adherence to electrical safety procedures. Only licensed and authorised electrical workers may perform the disconnection. Site-specific emergency response plans must be in place, and all workers must be appropriately trained and inducted.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Disconnection of Service Mains SWMS – Style A
    • Disconnection of Service Mains SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.           
    Add to cart Details
  • Connection of Underground Service Mains Safe Work Method Statement (SWMS)  SWMS Overview 

    This work involves safely connecting underground service mains from the supply point to the customer’s installation. Key risks include electric shock, contact with live parts, damage to underground assets, manual handling injuries, and excavation hazards. Controls include isolating supply, confirming underground services before digging, using insulated tools and PPE, and following lockout/tagout procedures. Only licensed personnel are to carry out the work. Emergency plans must be in place, and all workers must be trained and inducted.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Connection of Underground Service Mains SWMS – Style A
    • Connection of Underground Service Mains SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Installation of Underground Service Mains Safe Work Method Statement (SWMS)  SWMS Overview 

    The installation of underground service mains involves trenching, laying conduits or cables, and connecting electrical supply to the point of entry or distribution. Key risks include contact with underground utilities, trench collapse, manual handling injuries, and electrical hazards. Control measures include obtaining and reviewing DBYD plans, using non-destructive digging for service identification, ensuring trench safety through shoring or benching, utilising mechanical lifting aids, and wearing appropriate PPE. Only licensed electricians should perform electrical terminations. The task involves high-risk construction activities, such as excavation deeper than 1.5 metres and work near live services, requiring thorough risk assessments. Emergency plans, worker training, and adherence to legislative and Australian Standard requirements are essential for safe execution.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Installation of Underground Service Mains SWMS – Style A
    • Installation of Underground Service Mains SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Reconnection of Consumer Mains at the POA: Safe Work Method Statement (SWMS)  SWMS Overview 

    This task involves the safe reconnection of consumer mains at the Point of Attachment following maintenance, upgrade, or installation works. Hazards include contact with live conductors, arc flash, and working at heights. Controls include confirming isolation before work, testing prior to energisation, use of insulated tools and arc-rated PPE, and safe access via secured ladders or EWP. The area must be kept clear of unauthorised persons. Final testing and verification must be carried out in accordance with AS/NZS 3000 and AS/NZS 4836. All work must comply with WHS Regulations and the applicable service and installation rules.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Reconnection of Consumer Mains at the POA SWMS – Style A
    • Reconnection of Consumer Mains at the POA SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.             
    Add to cart Details
  •      
    Add to cart Details
  •   Replacement of Service Fuse Bases Safe Work Method Statement (SWMS)  SWMS Overview 

    This Safe Work Method Statement outlines the safe procedure for replacing service fuse bases within a low-voltage electrical supply system. Key hazards include electric shock, arc flash, burns, exposure to live components, and equipment failure.

    Control measures include isolating the electrical supply, confirming de-energisation with a calibrated tester, and using insulated tools and arc-rated PPE. The work area must be secured with signage and barriers, and a standby person should be present throughout the task. Where the fuse base is part of a metering panel or service pillar, additional care must be taken to assess structural integrity and earthing.

    Only licensed electricians trained in low-voltage rescue and CPR are permitted to carry out the task. The replacement must be performed in compliance with AS/NZS 4836, local distribution authority rules, and WHS regulations. A post-installation inspection and verification test must be completed before re-energising the supply.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Replacement of Service Fuse Bases SWMS – Style A
    • Replacement of Service Fuse BasesSWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Reinstate Service and Energise Installation Safe Work Method Statement (SWMS)  SWMS Overview 

    This SWMS covers the safe process for reinstating the electrical service and energising an installation after work or disconnection. The primary hazards include electric shock, arc flash, equipment failure, and improper reconnection leading to fire or injury.

    Control measures include confirming the integrity of the installation, verifying correct wiring and connections, and ensuring all safety checks and tests are completed. Energisation must only occur after confirmation that the system is safe and compliant with applicable standards. Personnel must wear appropriate arc-rated PPE, use insulated tools, and follow electrical safety testing protocols.

    Only licensed electricians may perform this task, and all work must comply with AS/NZS 3000, AS/NZS 3017, and relevant WHS regulations. A final visual inspection, continuity test, polarity test, and voltage verification are required before applying power. Documentation and notification to the network provider should be completed as needed.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Reinstate Service and Energise Installation SWMS – Style A
    • Reinstate Service and Energise Installation SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.             
    Add to cart Details
  • Remove Service Fuse Carriers Safe Work Method Statement (SWMS)  SWMS Overview 

    This SWMS outlines the safe procedure for the removal of service fuse carriers in low-voltage electrical installations. Key hazards include electric shock, arc flash, and burns from live parts. Controls include electrical isolation, testing for de-energisation, use of insulated tools and arc-rated PPE, and ensuring a trained standby person is present.

    The task must only be carried out by qualified personnel who have current training in Low Voltage Rescue and CPR. Work should follow a formal pre-start risk assessment, include appropriate signage and barriers, and comply with relevant electrical safety regulations and Australian Standards (e.g., AS/NZS 4836).

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Remove Service Fuse Carriers SWMS – Style A
    • Remove Service Fuse Carriers SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.         
    Add to cart Details
  • Prove De-Energised Safe Work Method Statement (SWMS)  SWMS Overview 

    The Safe Work Method Statement (SWMS) for Proving De‑Energised outlines the mandatory safety steps and controls required to verify that electrical equipment, circuits, or installations are isolated and safe to work on. This SWMS ensures compliance with Australian Work Health and Safety (WHS) legislation, the Electricity Supply (Safety and Network Management) Regulation, and relevant standards such as AS/NZS 4836 – Safe Working on or near Low‑Voltage Electrical Installations.

    Key focus areas include obtaining appropriate isolation permits, applying lockout/tagout devices, and maintaining accurate documentation of all isolations. It details the requirement to use an approved and tested voltage detector on a known live source before and after proving de‑energisation, in line with the “Test Before You Touch” principle.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Prove De-Energised SWMS – Style A
    • Prove De-Energised SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.             
    Add to cart Details
  • Sale!

    Site Assessment and Set Up for ASP Level 2 SWMS

    Original price was: $75.00.Current price is: $55.00. incl. GST
    Site Safety Assessment and Setup Safe Work Method Statement (SWMS)  SWMS Overview 

    The Safe Work Method Statement (SWMS) for Site Safety Assessment and Setup for ASP Level 1 and Level 2 works outlines the procedures and risk controls required to establish a safe working environment when constructing, upgrading, or connecting electrical infrastructure within the distribution network. This includes overhead and underground works, service connections, metering installations, and associated civil activities. It ensures compliance with Australian Work Health and Safety (WHS) legislation, the Electricity Supply (Safety and Network Management) Regulation, network operator requirements, and relevant Australian Standards (e.g. AS/NZS 3000).

    Key focus areas include conducting a comprehensive site risk assessment prior to work commencement, identifying underground and overhead electrical assets, confirming network isolation requirements, and establishing appropriate exclusion and no-go zones. It highlights the setup of site-specific traffic and pedestrian management plans, placement of warning signage and physical barriers, and ensuring the stability of the work area (including excavations, ground conditions, and access points).

    This SWMS also addresses ensuring all workers have completed ASP site inductions, verifying authorisations for live work (if applicable), and coordinating with the network operator’s representative before energisation or de-energisation. Emergency preparedness is included, such as confirming the location of first aid kits, fire extinguishers, spill kits, and emergency assembly points.

    By following this SWMS, ASP crews can minimise risks associated with electrical hazards, plant and vehicle movements, excavation collapse, and unauthorised public access, ensuring the worksite is established safely, efficiently, and in compliance with WHS and network operator requirements before construction or connection works commence.

    Suitable for electrotechnology trades including: Compliant in all Australian States and New Zealand What’s Included  This ready-to-use SWMS package features: 
    • Understanding NECA SWMS 
    • JSA SWMS Cover Sheet 
    • Site Safety Assessment and Setup SWMS – Style A
    • Site Safety Assessment and Setup SWMS – Style B 
    • SWMS Sign off Sheet 
    Flexible SWMS Styles  To meet unique project and contractor needs, we’ve developed two consistent SWMS styles: 
    • Style A (Blue): A simple, streamlined version inspired by the Safe Work Australia template, perfect for workers who prefer clear, straightforward safety documents. 
    • Style B (Tan): A detailed format designed to meet strict compliance checklists, ideal for principal contractors requiring enhanced documentation. 
    Both styles maintain the same core safety content, ensuring consistency across projects. Workers inducted and trained in one style can seamlessly adapt to the other, streamlining document control and significantly reducing admin time and stress during the SWMS submission process.  Why Choose NECA SWMS?   NECA SWMS solutions are industry-specific, written by professionals with real-world experience, and based on Standards, Codes of Practice, and Legislation. These templates:  
    • Simplify compliance with principal contractor requirements.  
    • Save admin time with editable MS Word templates ready for instant download.  
    • Provide clear, user-friendly documents to reduce frustration in the workplace.  
    Completed SWMS templates. Simply insert your company logo, business details, and site details, and they’re ready to send off to your client. Templates can be amended to suit specific needs, saving valuable time and resources while maintaining compliance.   With a NECA SWMS, you can ensure robust safety practices, better version control, and a stress-free submission process.       
    Add to cart Details

Accredited Service Providers need SWMS, too!
If you’re an accredited service provider (ASP), you may have heard of SWMS before. They are, in fact, critical documents to meeting your regulatory requirements with the government, and for that reason it’s important that you pay close attention to them. NECA has a proven track record in proving top quality SWMS to those in the ASP industry, saving them a great deal of time and money in the process.
Why SWMS are so important
Australian WHS regulations defines some 18 activities which are classified as “high risk” for those working on them. Whether it’s risk of falls and drowning, exposure to harmful substances, or working in a flammable environment, these activities need employers and employees to work with an additional level of caution (for the full list of what is defined as high risk, click here)

SWMS are a step designed to help employers provide their employees with a safe environment to work. They are a document which, in basic terms, lists out all the areas of risk, and demonstrates what the employer and employees are doing to mitigate against those risks. If a workplace environment has any high risk activities involved in it, then a SWMS is a legally mandated document.

Each environment and new set of activities requires a new SWMS, as each environment and activity is different in nature. It’s important to be thorough and comprehensive with these, and then make sure the work environment takes the mitigation efforts seriously.
How to draw a SWMS up
You can draw your own SWMS, however, this is an inefficient and costly endeavour. As with all documents in the legal and regulatory space, precise language is critical and any details missed can become very costly in the event that they become legally challenged.

NECA Accredited Service Provider SWMS are a big cost saving for any organisation that needs a Level 2 electrical SWMS. They are written by Owen Leslie, an expert with electrical trade qualifications and a diploma in WHS. Leslie has also received a WHS Champion award from the Hunter Safety Awards. Leslie’s SWMS have been written in close consultation with all interest groups, including the safety regulator, electrical network distributors, construction companies and electrical contractors.

Every work environment is different, and you’ll need to ensure that the NECA SWMS does fully cover your activities (see disclaimer, below), however, as a baseline, it will be an invaluable resource in giving you peace of mind that your organisation and work processes are covered by best-in-breed safety documents.
How to access NECA SWMS for electricians
Accessing the right documents that you need could not be easier. Simply log on to the folder creator tool, which will allow you to select what documents you want from the NECASafe library. Then attach your logo and a few other details. That’s it! From there we will then quote, print and deliver the folders. These safety folders can be used for employees, vehicles or site safety folders. If necessary, you can even attach your own documentation to be included in the folder – which is important if your work project involves unique conditions not covered by the template SWMS.
Important Disclaimer Information

The documents in this pack are not aimed to meet all of your legislative requirements, but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.

In NECA Generic SWMSs, we wish to draw your attention to your responsibilities as a person conducting a business undertaking (PCBU), you are responsible for reviewing and implementing the NECA Generic SWMS into your own safety management system. As the PCBU, you must ensure that a safe work method statement (SWMS) are suitable or amended prepared prior to commencing any high-risk construction work, and that the work is done in accordance with the SWMS, which must be kept for the duration of the work.

Other responsibilities include:

·A PCBU must also ensure that workers have received induction and consultation of the Generic SWMS before undertaking any construction work, and a site induction before commencing work on a specific site.
·A PCBU must ensure that Generic SWMS are to be reviewed, and revised if necessary, if the high-risk construction work changes or if there is any reason to believe that risk control measures are not adequate.
·NECA does not guarantee that supplied Generic SWMS will pass all principal contractor or builders SWMS review process. Amendments may need to be made to suit principal contractor or builder requirements. * Amendments can be made by NECA for additional cost.

Jump on to the NECA Safety Folder Creator Tool for a free quote, or feel free to call us.

The National Electrical and Communications Association, its employees, officers and agents do not accept any liability for the results of any action taken in reliance upon, based on or in connection with NECA Generic SWMS.  To the extent legally possible, the National Electrical and Communications Association, its employees, officers and agents disclaim all liability arising by any breach of any duty in tort (including negligent mis-statement) or as a result of any errors or omissions contained in these document

Go to Top